Thursday, 6 October 2011

Day 1 - Workplacement 26/9/11

 
Time Started - 9:30
Time Finish - 5:30
Total Hours - 8

Self Assessment Report -
Uniform: 5
Punctuality: 5
Initiative: 4
Cooperation: 4
Work Standard: 5
Development of Skills: 5

The front entrance to the studio.
Today was my first day of work experience at tcn channel 9. Dressed in my smart casual clothing my day began with a train trip to Wynyard, then a bus ride to Willoughby and finally a walk up a very very steep hill to the channel 9 studios. Also doing work experience was Eric, as part of his TAFE course. At 9.30 I was greeted by technical director Marco Snickers and given my pass which allowed me access to the studio every day for the rest of the week.
Before my work placement commenced I was given a tour of the complex. I was taken level 3 of the building were the news edit rooms rooms were and also studio 3 was were A Current Affair and the 11am and 4.30pm news was filmed. Next I was taken to level 2 of the building were the on air tapes office was (the place were the commercials are played), were the audio booths where, were network connections was and most importantly were all the wires and technical cables were stored. Finally I was taken to the ground level of the building where the engineering office was, were I was to be today, to studio 1 were shows like kerri-anne and the 6pm news was filmed and finally I was taken to studio 2, the biggest studio in the complex used to record the footy show, the Sunday footy show and funnist home videos and other shows with live audiences. While in studio 2 I noticed the wide range of lights used hanging from the ceiling including par cans, profile spots, intelligent lights and fresnels. While in studio 2 I was also shown the audio mixing booth that still used a functional 25 year old mixing desk. 
The Cable Tester

Following my tour I was sent to my engineering to commence my work placement. Engineering is very similar to techincal or ICT support as they fix any problems with mixing desks, televisions or other devices. The engineers also make various wire connectors using crimpers and various screws and bolts. While in engineering I witnessed engineer Alex test the cable connection in fader 7 on the audio mixer in studio 1. Alex used a cable tester very similar to the one we have at school. The problem was not with the cables but with what setting the audio technicaian had the mixing desk on. After that problem was fixed I went with Alex to replace a television on level 4 of the building where the executives offices were. Alex told me that they mainly used LG tv's as they are cheap and work very well. After this I was sent to lunch.

Once I came back from lunch Marco sent me to the network cables/ connections office which can basically be described as the control centre for outside material from other connections eg Melbourne, London and LA. As well as this newtwork connections also deals with the frequencies and transmission signals used in live broadcasts. What I found interesting about network connections was how with the flick of a button you could talk to someone in LA. While in network connections I also noticed the first of many communication channel boxes. Most of the studios and offices have these boxes to communicate with all parts of the building. By flicking one of the buttons on a channel down you can communicate with that person in the channel and by flicking it up you can listen to what the other person is saying in the channel. 
Examples of Robotic cameras

Auto cue
After three hours in network connections I was sent to studio 3 for the filming of the 4.30 news with Wendy Kingston. What amazed me most about studio 3 was the cameras. Unlike studio 2 and 1 the cameras are not manouvered by camera operators but the cameras are robotic, controlled by the technical director. Along with the robotic cameras auto cue machines were also widely used in the studio. The autocue machines were actually cameras that reflected text into the cameras lens so that a host can look directly into the camera while saying their script. What also amazed me was the glass window behind the presenters in the studio which displayed the news edit room behind the window. Marco described the mirror as being the most expensive piece of equipment in the building as it is darkly tinted, blurred and placed on a 16* angle to ensure that the lights in the studio don't reflect off or through the screen.

A clip on microphone similar to the
 one Jason showed me
While in the studio I was lucky enough to talk to the audio technician, Jason. Jason showed me the audio mixer and the clip on microphones used on the hosts. These microphones were described as very fine microphones with two cables that feed into an XLR connector that goes into a patch bay on the news desk then into the audio mixer. As an audio technican, Jason is also responsible for the various music and sound effects described by the director as a sting. While waiting around for the news to start I talked to Jason about how he became an audio technician. He told me how he started out as a music producer in year 11 then fell into tv as the music industry detereorated. As I am interested in the music and audio industries Jason told me that employers look for people with engineering degrees from universities such as JMC and SAE.
My pass to get in.
Before the live filming commenced Jason did a line check with Wendy Kingston the host and also various reporters in locations outside the studio. The live broadcast began with a count down from 10 to start the program. After this Jason cued the opening music and voice over. Throughout various times in the program Jason controlled the volume and eq of the various presenters and also the sound effects present in the show including various wosshes and musical sounds. The broadcast however was not without its faults. At one time in the broadcast Jason was too late in turning up the volume of a guests microphone so briefly there was silence. Also a signal was lost during the broadcast so a section of the bulliten was cut short. Aside from these faults the braodcast was good to watch and interesting. After the broadcast I was done for the day.

Monday, 26 September 2011

Pre Workplacement: 24-25 Septeber


From the 26th to the 30th of September I will be undertaking workplacement at The Channel 9 Studios in Willoughby.  During my placement I will be assisting the audio crew with the set up and operation of various TV shows. I will be working from 9.30-5.30. The dress code for my placement is smart or neat casual and closed footwear needs to be worn.

Before my placement I was sent an email from Marco Sneikers the technical planning manager at 9. The email contanied my roster, welcome letter, confidentiality letter, placement record, questionaire and induction powerpoint.
My Roster
Transport: To get two and from my work placement I will be taking a train from Concord West station to Wynyard then from there I will be taking a bus (M40) to the channel 9 studios. I hope to gain a lot of knowledge from this experience.


Sunday, 25 September 2011

First Aid 16/9/11

On Friday the 16th of September the Entertainment, Hospitality and PDHPE classes participated in the senior first aid coarse offered by the college. The coarse was run by the Royal Life Saving Society of Australia.

 Before the coarse began we had to read a coarse book given to us by our teachers and also completet a comprehension book that accompanied the coarse book. In order to get our certificate we would need to finish the comprehension book.

During our coarse our instructors went over various things with us including what first aid is, legal obligations, cpr, shock, bandages, pressure imobalisation technique and practical first aid. To learn about these things our instructors put us through various practical tests including CPR using a dummy or "Little Anne", bandaging members of the class and practical First Aid Testing.




At the end of our coarse we were all had to sit an exam to gain our certificate. No one failed the test so we all gained our certificate. Overall the day was very enjoyable and informative and this certificate will hopefully benefit me in the future. 

Tuesday, 20 September 2011

My New Effects Pedal

For my Birthday I got given a Boss ME-20B Bass Guitar Multi Effects Pedal. My mum bought it from Billy Hyde's in Parramatta for $253.00. It has many different effects for use in performances that can be blended together and also saved for quick reference. These effects include:

Special Effects: T.wah up, T. wah down, T. wah edge, defretter and octave
Compressor/Drive: Compressor, overdrive, distortion, OD+direct, synth 1, synth 2
Delay/modulation: 0-99ms delay, 100-700ms delay, phaser, flanger, chorus, cho+delay, reverb.

Along with these effects there is also an equalizer, noise suppressor, bass enhance, wah, foot volume and master level controls. The coolest thing for me about the pedal is the wah pedal as it allows me to add tone to some songs that sound better with a wah pedal.


Here are some reviews:
http://multieffectspedals.guitarsphere.com/bass-multi-effects-pedal-boss-me20b/
http://www.musiciansfriend.com/bass/boss-me-20b-bass-multi-effects-pedal


Monday, 19 September 2011

Hunters Hill XFactor 16/9/11

On Friday the 16th of September myself and various other performing arts students performed at and attended the Hunters Hill X Factor performance held at the Hunters Hill Town Hall. The show was a great chance for students to show off their skills as performers to a team of judges. The show was run at a very professional level.

There were various people with professional standard jobs working at the show including a stage manager, audio technician, lighting technician and backstage crew. In rehearsals they gave all the performers run downs of what was happening in the show and what was expected of us backstage.

At the venue the first thing you notice when you walk in is huge lighting rig across the front of the stage. The rig was equipped with intelligent lights and par cans and their was also a projector above the stage that projected designs onto the back wall of the stage. At the very back of the hall there was also a follow spot light set up being run by students.


There was a huge audio system as well set up around the stage behind the lighting rig with speakers sitting either side of the stage. The audio system was used to play backing tracks for singers and also for wireless microphones, amplifiers and the DJ system set up on the side of the stage. 







In terms of vision systems there was a projector set up on the side of the stage to broadcast the show to the audience members sitting at the back of the hall. The quality of this was very poor though.

During the show all the performers were sat in front of the stage ready to be ushered off by the stage manager backstage. When backstage there was a dressing room for performers and also a storage area for instrument cases. on stage my band and myself used a wireless microphone, a bass amp, guitar amp and a drum kit mounted on a rostrum with wheels attached to the bottom. Before we began there was a issue with audio systems as one of the dancers from the previous act had pulled out a cable in the audio system.

The show overall was very enjoyable and of a very high professional quality.